Pipe · tanks · oilfield

Pipe & oilfield hotshot hauling

When a rig is waiting on a part, a joint of pipe or a pump, every hour costs money. We run oilfield and pipe loads direct from the supply yard in DFW to the Permian Basin, the Eagle Ford, the Haynesville and Oklahoma, day or night.

What we haul

  • Steel, aluminum and poly pipe
  • Tubing, casing and line pipe (within deck length and weight)
  • Pumps, valves and wellhead parts
  • Poly and steel tanks
  • Generators, light towers and compressors
  • Tools, fittings and supplies on pallets
  • Irrigation pipe and fittings

Pipe length and overhang

The deck is 40 ft. Most pipe up to around 40 ft rides on the deck; anything longer means overhang, which has legal limits and needs flags, so call first with lengths and joint counts. Pipe is loaded on dunnage, chained and strapped, with stakes or blocking so the bundle can't roll.

Steel pipe gets heavy fast. With a typical payload of roughly 15,000–16,000 lbs, the joint count is usually set by weight, not space. Give us the size, wall and count and we'll confirm.

Hot loads, any hour

Oilfield doesn't keep office hours. Call any time and we'll tell you honestly when the truck can be at your pickup. Midland–Odessa is about five to six hours from DFW, so a morning call is often a same-day delivery.

On the lease

Give us the lease name, gate directions, site contact and any safety orientation or PPE requirements when you book. Lease roads are fine in normal conditions; we'll let you know if weather makes a road unsafe for a loaded trailer.

Typical oilfield runs from DFW

RunDistanceDrive time
Midland–Odessa~330 mi5–6 hrs, same day
Eagle Ford (Karnes City area)~320 mi5 hrs, same day
Oklahoma City~205 mi3–4 hrs, same day
Shreveport~190 mi3 hrs, same day
Houston~240 mi4–5 hrs, same day
Carlsbad, NM~470 mi7–8 hrs, same day

Approximate road miles and driving time from the pickup city. Actual timing depends on pickup time, loading, traffic, weather and federal hours-of-service rules; we confirm a window when we quote.

Example loads

Off the deck.

Bundle of aluminum pipe on dunnage with a tarp-wrapped machine strapped behind it on a flatbed
Aluminum pipe and wrapped equipment
Large red and tan industrial castings chained and strapped on a gooseneck flatbed deck
Industrial castings, strapped and blocked

Questions

Before you call.

How long can the pipe be?

Up to about the 40 ft deck length rides on the trailer. Longer joints mean overhang, which has legal limits, so call with lengths before booking.

Can you deliver to a lease in the Permian?

Yes. Send lease directions and a site contact. Midland–Odessa is roughly 5–6 hours from DFW, so morning pickups often deliver the same day.

Do you run at night or on weekends?

Call any time. If the truck is available, we run when the load needs to move.

Book it

Tell us what, where
and when.

Call with pickup, drop-off, size and weight and you'll get a flat rate and a pickup window. Or send the quote form and we'll call you back.